Addendum: After talking with Dynon, I decided that I would modify the compass mount to rotate in the roll axis as well. The current horizontal installation will rotate later when the wings are attached and dihedral is built into the wings so that the tips bow upward. I wanted flexibility to rotate the compass to negate this and maintain true horizontal attitude.
Sunday, July 26, 2009
Right Wing: Dynon Remote Compass
I fabricated a mount and installed the remote compass near the right wing tip above the inspection opening and mount for the lift reserve indicator. In following pics, you can see the previously fabricated LRI sheet metal spanner between the ribs with the hole opening for the LRI probe mounted to an inspection plate. For the compass mount, I riveted a double strip of aluminum sheet to two plastic clamps which were then attached to the 1" compression tube. Since the compass was not very stable mounted to just this location, I then made and riveted a sheet metal support to the other in-board side. The remote compass was then secured to an aluminum platform with bolts. This platform was then sandwiched between the supports on each side with a bolt and wingnut. As a result, adjustments in pitch angle can be made by rotating the compass/platform assembly, as the leading face of the compass must match the angle of the instrument on the panel.

At this location, the compass is away from any magnetic interference, such as ferrous metal and electrical currents.
Sunday, July 19, 2009
Covering: Left Wing: Tape
The left wing is complete. Following are pics of the taping process. For the tape over the ribs, I decided to straight-line the tape from LE spar to TE spar at rib locations, rather than tape directly centered over each rib. Several of the ribs were not perfectly straight, so I thought this would enhance appearance. I first tacked the LE tape down with glue, let dry, then pulled tight and electrical taped at the TE spar. I marked edges of pinked taped with a pencil and then laid a bead of glue on the fabric in between. Finally, I laid the tape over the dried glue and applied thinned glue to the top of the tape and underlying glue.



Here are completed pics of left wing. Next, I will need to fabricate a platform for a remote compass or magnetometer, which I will mount in the right wing prior to covering. This unit needs to be installed away from any ferrous material or electrical wiring (magnetic interference) and will serve to provide heading indication (among other things?) on a Dynon glass cockpit EFIS/EMS that I will purchase later. I will mount it adjacent to LRI mount/inspection plate inside the wing with the ability to rotate the unit in pitch/roll axes for future adjustment.


A lot of effort was spent ironing down the pinked edges of the 2" and 4" tapes so that they would definitely lay adhered following painting and movement of the slipstream over the wing.
Friday, July 10, 2009
Sunday, June 28, 2009
Covering: Left Wing
After a late Saturday night in the garage, I finally got the left wing covered. First pics show the wing sheet metal roughed up with a scothbrite pad (to enhance glue adhesion) and then the entire wing bonding area cleaned with an acetone solvent. Masking tape was used as antichafe tape and applied to the structure where sharp areas occur. Two coats of U500 glue were applied to perimeter of wing and around under sides of spars, root rib and wing tip. Two thinned coats of U500 were applied to wing sheet metal to prevent "pinholing" following painting.






The bottom panel went on next, first two coats of glue were applied to LE/TE spars. Same procedure went as before, except this time, numerous large protusions existed on bottom of wing such as strut attach plates. The skin was glued on right over these features and after tautening the fabric was sized and the openings were cut for the skin to pass over. I had trouble getting fabric to lay down flat on TE spar as a result.

The fabric was than rolled over the top of the wing and glued down with thinned glue in beads around perimeter. The skin was then slightly tautened to remove wrinkles and skin was glued to sheet metal and to remaining areas on spars, rib and wing tip. Areas of the fabric had to be cutout to fit around ribs underneath. Tag ends of fabric underneath were trimmed off and ironed down.
The bottom panel went on next, first two coats of glue were applied to LE/TE spars. Same procedure went as before, except this time, numerous large protusions existed on bottom of wing such as strut attach plates. The skin was glued on right over these features and after tautening the fabric was sized and the openings were cut for the skin to pass over. I had trouble getting fabric to lay down flat on TE spar as a result.
Both sides were final tautened and complete. Next to the patches....


Monday, June 15, 2009
Covering: Fuselage: Taping
I can't believe I'm finally DONE with covering the fuse. A two week run to Spokane, WA threw a wrench into production. Following are pics of taping the fuse. First couple pics show measuring and marking 2" zone for glue where tape will go and then applying glue along the 2" width.
Left side (mosquitos covet this flying machine)...
Next, I lay the tape down and apply a bead of thinned glue down the centerline to secure tape...
This is then followed by gluing down the remainder of the tape with thinned glue across full width of tape. Following drying, the tapes were ironed down, concentrating on getting the pinked edges bonded tight. Some cleanup of glue with MEK was required on skin along taped edges and where spillage occured. Following are completion pics of covered, patched, and taped fuse; top first.
Followed by bottom (dang rudder cable grease rubbed on and through fabric at several spots)
Sunday, May 10, 2009
Covering: Fuselage: Patches
I completed all of the patches on the fuselage. Below are drain grommets and a lexan inspection ring which were glued directly on to the bottom rear end.
Here is the completed section following gluing and ironing of patches. 1" fabric overlap required on all patches.
Rather than tape around the battery door, I glued a large patch over the opening.

....and then cut out the center section and then glued fabric around the inside perimeter opening.
Below are left and then right rear sides of finished patches. The bushings shown are where the horizontal stabilizor will attach. Shown are elevator cable exit ring, rudder cable exit fairings and drain grommets (latter used for routing a cable through, in this instance). Left side has an inspection ring. The rings which are glued down and then patched have the openings cut out later and then plates or hardware are attached. For example the large D-shaped exit rings will later be cut open and a large plasic fairing (similar to the small white rudder cable exit fairing) will be screwed directly into the plastic ring.

Next pic shows the upper fuse behind the cockpit. Lots of patches here because I have the BRS bridles exiting in two locations over the Station 3 cross tube and then further aft at one location over the vertical stabilizor former tube. The bridles turned out to be remarkably thin, so bulges under the fabric weren't too noticeable. Patches also placed over an antenna mount plate and tangs where the skylight will attach later.
....and then cut out the center section and then glued fabric around the inside perimeter opening.
Subscribe to:
Posts (Atom)
Right side...
...and the aspiring co-pilot twin little buggers (turn 5 next month) are excited to see something finally resembling an aircraft...