On Monday September 18th, I picked up the S7 in Oshkosh, WI where it was delivered from Hays, KS the prior week. The first thing I did was examine the crate in detail for any damage. According to RANS, this is critical and to note even the most nominal defects on the Way Bill prior to signing off. Otherwise, the transport company is absolved of any liability in future claims. I did notice a dent in the plywood on the end of the box, corresponding to the front of the fuselage and had this noted.

Old Dominion Trucking then loaded the plane on a 16' long trailer that I had borrowed. I was then shocked when told that I was liable for the loading of the plane on the trailer! Especially when it had to be lifted 8' and placed over the trailer side rails while balancing precipitously on the forks of a forklift! All went well, however, and when the leading edge of the box was placed on the trailer another forklift pushed the remaining distance to the bulkhead.
With the help of my Dad, we strapped the box down and toe-screwed the base of the box to the trailer decking. The 19' long box overhung the trailer by 3'. The drive home was very stressful, as I did not insure the plane contents since that would have costed approx. $800. Once we got north of Green Bay and out of the gridlock I felt much better. My Dad stayed on my bumper the entire distance to guard against getting rear-ended.

To get the box off and into the garage, my Dad and I came up with idea to jack the trailer tongue up until the end of the deck was near the edge of the garage concrete and then using my ATV winch, coupled with a block and tackle fastened to the garage sill plate, pull it off the trailer. It worked wonderfully until the eyebolt holding the pulley to the wall failed. Fortunately, it did not break completely and still held together somewhat. Once we replaced the eyebolt, we got the garage-side box end on a "piano dolly" and then pulling became effortless. Likewise, we placed another dolly under the box, as the tailend of the box was pulled off the trailer.

The whole day from pickup to delivery was executed almost perfectly. The 1,200 lb box trailered great and we reached speeds of 70 mph on the way home. The long-awaited crate is now ready to be opened. Christmas in September?

Next goal will be to start inspecting the contents, beginning on the dented end. I'm concerned about the welded fuselage being impacted. Rans tells me I've got 30 days to inventory all of the parts.