Here is the back-side of the panel and the variety of depths encountered with each instrument.
Here is the completed panel ready to be screwed to the boot cowl, once it is painted and ready for installation.


and from mid-field...
Have a lot of rocks to contend with plus some ruts. I will let the soil "setup" for one year and then return with my dad's loader and mini-excavator to extract good fill and fill-in ruts. Probably stuck with having to pick rocks by hand. This Fall I will burn existing pulled stumps and remove remaining ones next year. 
This past week my excavating contractor began grubbing the stumps and placing them on the tops. The grubbed width is 75' and conforms to the runway surface.