
Here is the as-built runway looking south. Only one set of culverts were needed, as drainage ditching will convey majority of runoff around both ends of the runway.
and from mid-field...
Have a lot of rocks to contend with plus some ruts. I will let the soil "setup" for one year and then return with my dad's loader and mini-excavator to extract good fill and fill-in ruts. Probably stuck with having to pick rocks by hand. This Fall I will burn existing pulled stumps and remove remaining ones next year.
No comments:
Post a Comment