Following is my initial shot at a regrading/drainage plan, based off a site topo survey I performed. Proposed ground in pink, contour interval=1'. Stationing=50'. Several PVC culverts will be constructed under the strip.
Next figure shows a profile of the finished grade centerline, extending at -0.3 and -1.6%, respectively.
Next figure shows some of the cross sections. In general, the runway will be crowned to drain at 1.5% in each direction and then side-slopes will be constructed at 3:1. The site was designed to balance cut/fills with a net quantity moved of 2,800 CY.