Wednesday, December 26, 2007
Wings Continued: Ribs
Tuesday, June 26, 2007
Wing Construction: Frame and Ribs
Tuesday, January 02, 2007
Fuselage Fit-up: Floor Boards, Rudder Cable Assembly, Battery Access Door/Box, Baggage Compartment & ELT Mount
With the floorboards, main goals were to drill holes through where it will attach to fuselage tangs and where rudder pedals will attach. It was nice to actually do a little wood-working for a change. I think they will really dress-up and complete the cockpit. I strived for a maple look. I found for the wear plates, which were received scratched up, that a fine emery cloth cleaned them up fairly well. One note, the manual indicated that nut-plates (described below) were to be riveted to tangs where floorboards attach; however, Rans said it would be best to hold-off until after painting the interior. They claimed that since they can be installed easy later, it's best to wait so that the threads would not get buggered up with paint.

The battery access door and box assembly were simply riveted together and then to tangs on the plane. The door screws to the door frame via installed nut-plates (imagine a threaded nut riveted to something). The wire shown is a battery ground cable. You can also see rudder pulley cables and guides shown. Two rudder pulleys were also installed.



The baggage compartment has two metal straps that slide into separate pouches in the fabric on the sides and rear. Holes are drilled through the fabric and straps once wrapped over the fuselage tube and then riveted. Straps are also riveted to four points on the bottom of the fuselage and buckles are placed on the straps, which enables vertical tightening of the compartment.

The emergency locating trasmitter (ELT) is shown strapped to a mounting tray that is bolted to welded tangs. This unit senses sudden horizontal deceleration and will broadcast a signal on an emergency frequency. The unit utilizes simple D-cell batteries which is much more economical. The unit is also portable and can be taken away from a crash site for locating purposes.

Now that all installations are complete aft of the baggage compartment and things are fitup in the cockpit, the fuselage is ready for covering and the cockpit is ready for painting. Next, however, I will begin construction of wing structures.
Wednesday, December 06, 2006
Fuselage Fit-up: Main Gear (cont.) and Tailwheel


I then attempted to fit-up the tailwheel assembly. The tailspring is attached to the fuselage at three bolt locations: one forward and two aft. The latter two connections through three pillow straps, sandwiching the tailspring, to welded bushings on the fuselage. Upon inspection, I observed that the distance between the center of the welded bushings is much less (1/8") than the distance between the center of the holes on each pillow strap. Therefore, the holes were misaligned between welded bushings and pillow straps and bolts would not go through. I contacted Rans and they confirmed this is a common problem. Apparently, during welding operations the bead will cool and draw the bushing inward, resulting in the above discrepancy.
I decided to oversize drill the holes in the pillow straps from 3/16" to 1/4" in order to get the bolts to fit.
Saturday, October 28, 2006
Fuselage Fit-up: Main Gear
I constructed a jig to align the axles mounted on the gear legs (see below). Once the apparatus was built, I marked the drill holes through the gear sockets and step drilled up to the end size for later installation. I was informed that it is critical to ensure that the fuselage is in it's taxi position when doing this operation (when most of the tire wear will occur). I was told to place the fuselage on the floor with the gear legs in, measure this angle and then duplicate the angle in an elevated position. I used a hand clinometer to reproduce the elevated taxi position angle. This worked slick.

Footnote: I decide to replace the troubled gear leg mentioned above, and installation was uneventful; now I own a $260 "club".
Sunday, October 22, 2006
Fuselage Fit-up: Formers


Monday, September 25, 2006
Organize Shop/Parts and Inventory

Once I got everything out of the box I constructed a 16' long work bench and hung two 4x8 sheets directly above it for stapling of numerically labeled & bagged items. I also constructed a large drawer on wheels which slides under my existing work bench. I put the majority of my larger parts in there.

The inventory of 800 plus parts was very time-consuming. Rans sends you a parts list with an assigned Priority Number to every part. On the supplied list, I verified that each corresponding part was present, note where each part was in the shop on the list, and check off that I received it. The small, bagged parts were stapled in chronological order on the wall for easy locating. Rans did a very good job packaging and marking contents on all of the parts. I found every item except one consisting of aluminum tubing.Upon inspection of the fuselage I noted the vertical stabilizer was deflected somewhat to the port side. After verification with Rans, they indicated all of their inventory of cages have this problem and originated from a bad jig. The engineer claimed the vertical front tube on the vertical stabilizer is rotated to the left; however, the fin is still reasonably straight and should fly fine as their production models have the same problem; still disconcerting nonetheless.